How to build a skills matrix for your event team

Featured image for How to build a skills matrix for your event team article

You've got enough names on the event plan. What you don't know is whether anyone can take over when your ticketing lead is busy, your production coordinator is off, or a sponsor asks a question that only one person knows how to answer. Finding that out during the event can mean a stopped entrance queue or a last-minute booking for help you thought you already had.

An event team skills matrix helps you check that coverage before you need it. It's a record of the tasks your event depends on, who has demonstrated they can do each one, and what support they still need. Build it around observable work, then use the gaps to decide what to practise, who to book and which commitments to simplify.

The important part is what happens after you fill it in. A colleague listed as your backup needs the relevant ability, access and time to cover the job. If they're already running another part of the event, the extra name hasn't resolved your problem.

This guide walks through a practical way to build the matrix, assess people fairly and fund the work that closes the gaps. We'll use a fictional paid conference team throughout, with a sample task record and training budget you can adapt. You can start in an ordinary spreadsheet. You don't need to buy a staff management system before asking who can actually do the work.

Start with the event you're trying to deliver

A skills list becomes vague when it starts with qualities such as leadership, creativity and being good with people. Those qualities matter, but they don't tell you whether somebody can reconcile the ticket report or check a sponsor's delivery against the signed package. You need that level of detail to make a staffing decision.

Pick an upcoming event and write down its promises. What have ticket buyers paid to receive? What have you agreed with speakers, sponsors and the venue? Which tasks protect those commitments, and when must they happen? This keeps the exercise connected to the work your business needs done.

For a paid conference, you might depend on publishing accurate ticket information, handling booking questions, admitting the right ticket holders, preparing the speaker schedule and checking sponsor materials. Include the less visible work after the public programme, such as recording unresolved customer cases and handing over outstanding supplier questions. A polished entrance doesn't compensate for promises nobody follows through afterwards.

Keep the first version bounded. Map the tasks for one event or one recurring format before trying to catalogue every skill in the company. A conference series and an outdoor music event may share some commercial work while needing very different specialist support. Combining everything too early makes the record difficult to use.

Ask the people doing the work to help define it. They can identify the exceptions a manager misses, such as checking which booking belongs to an attendee when a group bought several tickets. They'll also tell you when a task requires information the business hasn't supplied. That matters because a missing instruction can look like a missing skill.

If the wider staffing structure is still unclear, our guide to building an event team without burning people out covers responsibilities and available working hours. Here, we're checking the ability required inside those assignments. You need both views before treating a role as covered.

Turn broad responsibilities into tasks you can assess

Write each task as an action with a result someone else can check. "Ticketing" is too broad. "Identify the correct booking, apply the approved ticket-exception process and record an unresolved case for the lead" gives you something to observe. It also describes where the person's responsibility ends.

Use the same approach outside ticketing. Replace "sponsor management" with a task such as checking the supplied artwork against the approved deliverables list and referring a requested extra before promising it. Replace "programme skills" with confirming speaker details against the current schedule and communicating an approved timing change to the affected people.

Don't split work into such tiny pieces that the matrix becomes harder to maintain than the event plan. Opening a document and finding the correct tab don't usually need separate entries. Split a task when it has a different consequence, requires different evidence or needs a different person to assess it.

Routine admission and resolving an unusual booking are worth separating. Someone can be ready to scan an ordinary ticket while still needing support with exceptions. Combining both under a single green tick would hide the very gap you're trying to find. Similarly, preparing a supplier request and approving the resulting expense are different responsibilities.

For every task, describe the conditions that matter. Can the person do it using your current software? At this venue? With the information available on the day? A capable coordinator who knows last season's process may need a short update rather than a full course. A new task with unfamiliar consequences may need much more preparation.

Link the agreed procedure or example from the task record so the assessor and colleague are judging the same result. If two managers have different ideas about a correct outcome, resolve that difference before assessing anybody. Otherwise you're recording whose preferences the person happened to anticipate.

The first useful improvement may be rewriting the task itself. If nobody can explain what successful completion looks like, the business isn't ready to judge whether an individual has achieved it.

Choose a small set of ability labels

Use labels your team can explain without a legend full of numbers. A simple working set for ordinary operational tasks is "not assessed", "needs guided practice", "can work within the agreed procedure" and "can assess or coach this task". These are suggested labels for your own record, not an accredited competence scale.

"Not assessed" means you don't yet have enough evidence. It doesn't mean the person is incapable. That distinction matters when someone joins from another event business. They may bring substantial experience, but you still need to check the parts that depend on your processes and conditions.

"Needs guided practice" means you know which support is required. Record the supervisor and the situations that need help. Avoid using this label as permission to leave a trainee alone because the event has become busy. Supervised work requires a person who can provide the supervision when it is needed.

"Can work within the agreed procedure" applies to the task and conditions you've assessed. It doesn't give somebody authority to change the ticket policy or approve extra spending. It also doesn't establish that they can train someone else. Teaching requires them to notice errors, explain the reasoning and give useful feedback.

Great Britain's Health and Safety Executive's guidance on training and competence says training is one part of competence and that practice matters too. Its safety guidance also calls for assessment methods appropriate to the hazards involved. Use the relevant qualified assessors and local requirements for specialist work; this article's ordinary task labels don't certify anybody for it.

Keep a separate field for restrictions. Someone might handle routine booking corrections while referring refund decisions, or prepare a sponsor update that requires approval before sending. A short label alone can't hold that information.

Don't add all the labels together to rank your employees. A person who can perform many routine tasks isn't automatically a substitute for the one person qualified for a critical specialist job. The useful question is whether each required task has suitable coverage, rather than who has the highest total.

Gather evidence without turning it into an exam day

Start with a conversation about work the person has already done. Ask which tasks they can demonstrate, where they want practice and which conditions are unfamiliar. Self-assessment is useful for finding evidence and concerns. Treat it as the beginning of the discussion rather than the final rating.

Choose evidence that matches the task. For an attendee update, review a draft using an approved fictional programme change. For a supplier comparison, ask the person to explain the complete cost and identify an unresolved condition. For a ticket exception, walk through a test case without exposing a real customer's information unnecessarily.

Where possible, observe the task in a safe practice setting using the actual tools and instructions. Ask the colleague to explain what they would check and why. You want to know whether they understand the work well enough to recognise an exception, not whether they can memorise the order of buttons.

Include a case they should refer. A confident answer to every scenario can conceal a poor understanding of limits. The person who stops and asks for an approval when the procedure requires it may be demonstrating better judgment than someone who improvises a quick solution.

Record enough evidence to support the conclusion. "Observed handling the agreed routine ticket cases in practice, using the current procedure" is more useful than "great attitude". Add the assessment date, assessor and any restrictions. Keep the evidence itself in an appropriate location rather than pasting private correspondence across a shared sheet.

Make the exercise proportionate. A routine administrative task may need a brief demonstration and review of existing work. Higher-consequence work may need a more formal assessment by somebody qualified to judge it. Watching a person explain a technical task you don't understand gives you very little basis for signing it off.

Tell people what the record will be used for before assessing them. They'll give you a more useful account of gaps if asking for practice doesn't immediately become a criticism. You can still set a required standard and make staffing decisions. Be clear about the evidence and give the person a fair chance to understand and respond to it.

Build a matrix you can read during planning

In a spreadsheet, put tasks down the left and team members across the top. Each intersection holds the current ability label for that person and task. Keep the detailed evidence in linked task records or a separate tab so the main view remains readable.

Alongside each task, include its required coverage period, the person responsible for assessing it and any specialist requirements. Then identify the intended primary person and backup. Those assignments are planning decisions made using the ability information, rather than another way to describe a rating.

Keep availability in the event roster and reference it when checking cover. You don't need to copy every shift into every cell. You do need to be able to see whether the person named as backup is working, on a break or assigned somewhere else when the task might need them.

For each gap, record the next action, owner and decision date. "Training needed" leaves the work unbooked. "Ticket lead to run the agreed exception cases with the coordinator before the roster is confirmed" tells you who needs to arrange something. Give the action an actual date in your working version.

Avoid colour as the only way to communicate status. Write the label in the cell, and make sure the sheet is usable when printed or read without distinguishing the colours. That also reduces the temptation to argue about a green score whose meaning nobody can remember.

Decide who can edit the main record. An open sheet where people overwrite each other's conclusions will become unreliable quickly. Let colleagues submit evidence and corrections, then have the named assessor or record owner update the status. Preserve enough history to understand why an assignment changed.

Keep this separate from your daily briefing. The matrix supports preparation and assignment; the event team briefing communicates the duties, timings and contact routes people need for the actual event. Crew shouldn't have to interpret a company-wide development record to find out where to report on Saturday.

A worked example for a paid conference team

Imagine a fictional business preparing a one-day paid conference called Makers Assembly. The people, tasks and costs in this example are invented to explain the method. They aren't customer results, recommended staffing ratios or a complete event delivery plan. Specialist production and safety work is contracted separately.

The core team has five people. Lina directs the event, Joel leads ticket operations, Priya coordinates the programme, Tess handles sponsor delivery and Ben supports operations. Their titles describe the main assignments. The matrix checks selected tasks inside them, without assuming everybody can take over everything.

The team begins with routine ticket scanning. Joel has demonstrated it using the current process, and Ben has completed guided practice but hasn't yet shown he can handle the agreed routine cases without prompts. Priya hasn't been assessed. Lina might know the system, but the team doesn't count an untested assumption as cover.

For ticket exceptions, Joel can work within the approved procedure. Ben needs guided practice, including when to refer a case. Priya is not assessed. That means the business currently depends on Joel for this selected responsibility. It cannot solve the gap by adding Ben's name to the roster as though his assessment had already happened.

Programme updates show a different pattern. Priya can prepare an accurate update using the confirmed schedule, while Tess can do it with guidance. Lina retains approval of a change to the advertised offer. Tess learning to prepare the message won't transfer Lina's commercial decision to her.

Sponsor artwork checks have two demonstrated people, Tess and Ben. That looks healthier until the team checks when the work is due. Ben is also supposed to cover the entrance setup during the same period. His ability is useful, but the producer still has to resolve the overlapping assignments.

The first version has already produced decisions. Arrange Ben's ticket practice and assessment. Decide who can cover Joel's exception work if Ben isn't ready. Move the sponsor artwork deadline or find available cover. These are specific actions the event can fund and schedule. A general instruction to improve teamwork wouldn't tell anybody what to change.

Check whether a backup can really take over

A backup needs more than a suitable ability label. Check that they have accepted the assignment, can access the current information and can be available during the relevant period. Then test what happens to their original job when they move.

In the conference example, Ben might become capable of handling routine admission. If he is also the only person receiving a supplier during the arrival rush, calling him the entrance backup creates a second gap. The producer has to arrange relief for one responsibility or choose someone else for cover.

Think about interruptions as well as planned absences. A ticket lead can be on site and still unavailable because they're resolving a complex case. If every ordinary question needs that same person, the queue can stop even though the roster says the lead is working. Define which work the trained colleague can continue and when the lead must intervene.

Test an ordinary handover before relying on it. Have the backup find the current procedure, use their own account where applicable and explain how they contact the decision owner. Let them handle the practice case while the primary person observes. If the primary keeps taking over, you haven't learned whether the cover works.

Also check shared dependencies. Two people who both need the founder's phone or password aren't independently able to cover the process. Neither are two coordinators whose only source of current information is an absent colleague. Fix the access or document problem instead of scheduling another generic skills session.

You don't need to train the whole team for every role. That can consume preparation time while leaving the most important gaps unresolved. Choose cover according to the consequences of interruption, the time needed to recover and the work people can reasonably learn. Some responsibilities need a qualified external replacement rather than a colleague with a short briefing.

Our guide to check-in staffing and lanes helps with the separate question of how much entrance capacity you need. A matrix can show who is able to work there. It can't establish how many people or positions your arrival pattern requires.

Decide whether the gap actually needs training

Before booking a course, ask what prevented the person from completing the task. They may lack knowledge or practice. They may also be following conflicting instructions, using the wrong access or waiting for an approval that nobody owns. Those problems need different responses.

The CIPD's guidance on identifying learning needs connects development to the organisation's required performance and advises considering ways to meet a gap rather than defaulting to a course. For your event, start with the result that isn't happening and investigate what would allow it to happen.

Suppose Tess prepares a sponsor update with the wrong delivery time. If the supplier changed the time and nobody updated the working plan, retraining Tess in attention to detail won't fix the cause. Correct the information process. If she had the current plan but didn't know which field to check, focused practice may be appropriate.

Or Ben completes every routine ticket case accurately but falls behind because he's also answering supplier calls. That doesn't establish an ability gap. You may need to remove the second assignment. More practice can help him become familiar with the process, but it won't let him be in two places at once.

Choose the response while there's still time to use it. Guided practice suits a bounded operational task that a qualified supervisor can teach and assess. A specialist booking may be better when the work needs expertise your team doesn't have. Simplifying an unsold optional service may be better when the business cannot fund its delivery.

Distinguish essential cover for this event from longer-term development. Someone may want to learn programme management across the season. You can support that without relying on them to replace an experienced programme lead next week. A development goal becomes useful cover only after the relevant ability and availability have been established.

For each open gap, write the fallback if the planned learning doesn't produce the required result. Keep the existing qualified cover, arrange another person, reduce the permitted task or change the event plan where the promises and requirements allow it. "They'll probably get there" isn't a staffing decision.

Choose which gaps to close first

Once you can see the gaps, resist booking whatever training is easiest to organise. Start with the consequence of leaving each task uncovered and the last date you can still arrange a workable alternative. A missing backup for an admission responsibility may need an earlier decision than an extra person who can prepare next month's promotional report.

Look at how quickly the team could recover if the primary person became unavailable. Could the task wait until tomorrow without breaking a promise? Could an available, assessed colleague take over using the current instructions? Or would the business need to find specialist help at short notice? Answer those questions with the people responsible for delivery, rather than assigning a score because a template asks for one.

At Makers Assembly, the team could finish sponsor artwork checks earlier, when both Tess and Ben are available. That would remove the planned overlap without teaching anybody a new skill. Ticket-exception cover needs a different decision because the work can arrive throughout admission. Joel's availability and a workable replacement arrangement remain important even after the ordinary scanning practice is complete.

Choose a decision deadline that leaves time for the fallback. If a replacement supplier needs notice before confirming availability, waiting until the day before doors to assess your trainee may remove that option. Work backwards from the real booking and preparation conditions. Don't assume a convenient internal training date leaves enough time to change the staffing plan.

Discuss the plan with the learner as well. Someone may be interested in the new responsibility but unable to attend the proposed session. You can change the practice time, choose another willing colleague or retain different cover. Treat that as a scheduling decision. It doesn't tell you that the person lacks commitment or ability.

Finally, name what you are postponing. Lower-priority development can stay in the season plan with a review date while you resolve the event's immediate requirements. The point of prioritising is to make a funded decision about each important gap, including a decision to use existing qualified support instead of rushing someone through training.

Pay for practice and the people supporting it

Training takes working time for the learner and the person teaching or assessing them. Put both into your event budget. Include preparation, access setup, the practice itself and any follow-up. Otherwise the plan can appear cheap only because the experienced lead is expected to absorb the extra work.

Agree the paid time and terms before asking people to attend. The rules depend on employment status, jurisdiction and the arrangement. In Great Britain, Acas's guidance on payment for mandatory training explains the role of contractual terms and minimum-wage protections. Check the applicable requirements for your team rather than assuming an evening practice session can be unpaid.

Here's a fictional USD budget for selected administrative practice at Makers Assembly. These invented rates are fully loaded costs for this example, including the employment or supplier costs the business has assumed. They aren't local pay benchmarks. The exercise covers ticket and sponsor administration, with no specialist certification implied.

Four colleagues each attend a two-hour practice session at $30 per hour. That is eight learner-hours costing $240. The facilitator attends for two hours and spends another two hours preparing, at $45 per hour, costing $180. A separate assessor spends two hours reviewing the demonstrations at $45 per hour, costing $90.

The known total is $510. The business also authorises up to $90 for an additional two assessor-hours if targeted reassessment is needed. That makes the maximum authorised amount $600. If no reassessment happens, the cost remains $510; the unused allowance hasn't been spent.

The planned work uses fourteen person-hours before any reassessment: eight learner-hours, four facilitator-hours and two assessor-hours. Make sure those hours exist in the preparation schedule. The learners can attend together, so eight learner-hours don't mean an eight-hour session. The preparation and assessment time still need their own arrangements.

If some colleagues are salaried, their time may already be included in committed payroll. Show the allocation without adding the same salary cost twice. Identify separately any extra cash required for freelancers, additional paid hours or an external assessor. A full cost view and a payment schedule answer different questions, and you need both.

Make the practice resemble the work

A session becomes useful when people perform the task, receive feedback and try the uncertain part again. Sending a recording may explain the process, but it doesn't show whether someone can apply it when a case differs from the ordinary example.

For Ben's ticket practice, prepare fictional cases that match the event's approved procedure. Start with an ordinary booking. Add an exception that he is allowed to resolve, then one he must refer. Tell him which resources he can use, because finding the current answer is part of the real job.

Use the same basic criteria for each colleague assessed on that task. Did they identify the correct case, follow the current procedure, stay within their permission and leave the required record? Adapt the method for legitimate support needs without quietly lowering the required result. Give feedback about the task rather than someone's personality.

Let the person explain a hesitation. They may have noticed an ambiguity the assessor missed. If the procedure doesn't cover a case, pause and fix it before treating their uncertainty as failure. Good practice can improve the instructions as well as the individual's familiarity with them.

For ticket scanning, Loopyah's ticketing tools let you give door staff check-in access and have them scan QR tickets from their own phones. Add the right people without sharing your login, then practise with the access and process they will actually use. That makes the assignment workable. Your team still needs to define the exception route and establish who is ready for each task.

Keep practice data separate from real customer cases wherever possible. Agree a safe testing method for the tools involved. Don't create live transactions, alter a genuine booking or send an attendee message just to demonstrate confidence with a button. An assessor should know how the exercise works before asking a colleague to perform it.

At the end, record what the evidence supports. Ben may be ready for routine admission while still needing supervised exception practice. That is useful progress. It doesn't need to become an all-or-nothing verdict on whether he is good at events. Put him on the tasks he can do and keep the remaining support explicit.

Keep specialist competence separate from a general team score

Some event work requires qualifications, licences, experience or assessment that an ordinary team exercise can't establish. Identify those requirements with the venue, suppliers and appropriate specialists. Record the requirement and verification route rather than inventing an internal score that appears to replace them.

Great Britain's HSE guidance on managing an event calls for competent staff and supervision suited to the work and risk. It also distinguishes coordinating event activities from taking responsibility for every technical job performed by contractors. Apply the appropriate requirements for your location and event; a spreadsheet doesn't change those responsibilities.

Your operations coordinator may need to recognise a problem, stop their own assigned activity where required and contact the responsible specialist. That is a different task from fixing the technical problem. Assess the reporting and coordination task without implying that the coordinator can carry out the specialist work.

Ask a supplier who will perform and supervise the contracted work, what relevant evidence is required and how a replacement will be checked. Your matrix can reference the confirmed service and responsible contact. It shouldn't treat one supplier employee's name as a permanent guarantee when the supplier later sends someone else.

Be especially careful with the coaching label. Someone who can explain your check-in process isn't therefore qualified to assess electrical work, rigging or emergency arrangements. Name the scope of each assessor's responsibility and refer specialist questions to somebody equipped to judge them.

If specialist cover becomes unavailable, use the agreed event arrangements to decide what happens. A willing colleague with a high general score is not a substitute. This is a reason to confirm replacement provisions before the show, while there is time to obtain suitable help or change the affected activity.

Keep the record fair, current and appropriately private

A matrix contains information about people's work and development. Decide who needs the detailed record and who only needs the resulting assignment. Most entrance staff need to know their duties and referral contact. They don't need access to everybody else's assessment notes.

For UK employers, the Information Commissioner's Office's guidance on keeping employment records covers purpose, accuracy, security and appropriate use of worker information. That guidance is under review following changes to UK law. Check the current requirements where you operate and explain to your team what you collect and how you'll use it.

Keep notes factual and relevant. "Needs practice identifying the referral condition in the current procedure" gives the colleague something to work on. "Not confident enough" may describe the assessor's impression without explaining the evidence. Avoid putting personal health details or private explanations into the operational view.

Give people a route to correct errors and supply updated evidence. If a colleague has since demonstrated the task, leaving an old restriction in the sheet can block useful opportunities and mislead the next producer. Record the review rather than letting informal reassurance substitute for an update.

Use review triggers that match the task. A changed system, venue, procedure or assignment may affect earlier evidence. So can a long period without doing the work. There isn't one expiry date that makes every operational skill current. Ask what has changed and what needs checking again.

Don't erase a person's capability because they're unavailable for a particular shift. Keep ability and availability distinct. Equally, don't carry last year's event assignment into this year's roster without confirmation. The record should allow a manager to see both what someone can do and whether the business can rely on them for this occasion.

Use the next event to check whether the gaps closed

Before confirming the final assignments, review each important task against the people actually booked. Has the intended backup completed the required practice? Does the assessment support the full task or only part of it? Is a qualified supervisor available where supervision remains necessary?

At Makers Assembly, suppose Ben demonstrates routine admission but still needs guidance for ticket exceptions. The producer can assign him routine scanning within the agreed arrangements and retain Joel's exception coverage. If the plan requires Joel to be away, the producer needs another suitably assessed person or a different coverage plan before treating that period as resolved.

Also check the sponsor task. Ben and Tess may both be able to verify artwork, but the producer still has to move Ben's conflicting assignment or schedule the check earlier. Updating his ability label doesn't settle the timing. The final event plan needs an actual available person against the deadline.

During delivery, record significant differences between expected and actual work. Did people use the current procedure? Were they repeatedly sent cases outside their permission? Did the backup get called but lack access? Those observations help distinguish a training problem from an assignment or information problem.

Afterwards, use your event debrief to agree the next change. Look beyond whether the show finished successfully. A lead who quietly did every difficult task may have protected this event while leaving the same dependency in place for the next one.

Check the actions, too. A course booked, a document read or a practice session attended is an activity. The result you need is evidence that the person can perform the defined task under the relevant conditions. Keep the gap open when that evidence is still missing, and make the cover decision accordingly.

A task record you can copy into your own matrix

Use the main sheet to compare coverage, then keep a short record for each task that needs more explanation. The following fictional entry records Ben's position before further practice. It shows what useful detail looks like without turning it into a lengthy appraisal.

Task: handle an ordinary ticket scan using the current admission procedure for Makers Assembly. Required result: identify whether the presented ticket can be processed through the routine admission route, follow the approved steps and refer any exception to the ticket lead. The record doesn't authorise policy changes or specialist safety decisions.

Person and evidence: Ben, observed by Joel in agreed practice before roster confirmation. Current status: needs guided practice. Evidence still needed: complete the agreed routine cases without prompts and identify the cases that must be referred. The assessment must use the current process and the access assigned for the event.

Planned action: Joel arranges the practice, Ben confirms attendance and Lina makes the coverage decision before issuing the final roster. The fallback is to keep suitably assessed cover in place and limit Ben to supported work until the required result is demonstrated. Planned learning doesn't become a completed rating automatically.

Operational checks: confirm Ben's working period, accepted assignment, device arrangements and check-in access. Check who covers his other work if he moves to admission. Record the relevant procedure version, assessment date and next review trigger in the actual working record.

You can adapt those fields for programme updates, sponsor checks or other bounded tasks. Begin with the responsibility that currently depends on one person, and ask that person and a potential backup to define the work together. Book the practice and decision time while you can still change the plan. Before the next roster goes out, somebody should be able to point to the evidence and explain who will cover the task if the primary person can't.